Leading Technical Institute Relies on Phoenix Air Core Reactors
As electrical demand increases at a leading technical institute, the university takes on an ambitious program to upgrade every facet of its power distribution system. Read about how the university turns to Phoenix Electric Corp to upgrade it’s current-limiting reactors.
PEC Reactors Help Protect Data Center at Major Theme Park
One of the most well-known theme parks in the world trusts Phoenix Electric reactors to help protect their global data centers.
PEC Helps Maintain Power Generation and Agriculture Irrigation Along the Columbia River
Phoenix Electric worked with the US Army Corps of Engineers to upgrade the switchgear on all 27 generators of the Chief Joseph dam, the second largest hydro-power dam in the United States.
Hydroelectric Station Upgrades High-Current Switchgear
A hydroelectric station undergoes a major generator switchgear upgrade and works with Phoenix Electric Corp to custom design a one of a kind 6-cubicle switchgear/circuit-breaker unit for the retrofit.
PEC Controls Help Light Up the New York Skyline
Phoenix Electric was part of a major project to upgrade the aging transmission infrastructure in New York.